SubZero Cold Logistics

Project Overview

Insulated Concrete Tilt-up
Construction Type
$6.9m
Contract Value
November 2018
Completion Date

Location

2525 188th Street, Surrey, BC

View on Map

Description

This is the first tilt-up freezer building built in Western Canada and a first for RAM Construction—an insulated concrete tilt-up freezer storage facility where the temperature is maintained at a cool -25 degrees to store frozen foods. The 43,503 sq. ft. entire warehouse has been equipped with a state-of-the-art racking system to ensure the warehouse can be utilized for the rental of racking space for all types of frozen foods.