This building was an addition to the existing building. The existing tilt panels were re-positioned to accomodate the new portion of the building. A methane control system was installed due to the location of the building on a old waste dump.

Location

95 Brigantine Drive
Coquitlam, British Columbia
Canada

Similar Projects

Location

Construction

Construction Details

Size

30,000 Sqft.

Design

R.J. Morton Architect

Completed

2010

We build dreams

Whether you have a plan and are looking for a contractor, or you are working with a bare piece of land, RAM Construction Inc. can help. Offering a wide array of construction to architectural services, we can help turn your dream into a reality!

Let's get started

Complete the form below and we will respond promptly.

"RAM has proven to be fair, realistic and above all trustworthy with the assurance that they have our best interest at all times through the various stages and processes of a project."

Jim Pattison Auto Group